Loading...
Loading...
siemens-wins-compression-contract-for-golden-pass-lng
siemens-wins-compression-contract-for-golden-pass-lng

Siemens wins compression contract for Golden Pass LNG

0

Siemens Gas and Power has won a contract from CCZ JV – the joint venture between Chiyoda International Corporation, McDermott International and Zachry Group – to supply three cryogenic boil-off gas (BOG) compressor trains for the Golden Pass LNG export terminal in Sabine Pass, Texas, US.

Siemens Gas and Power’s scope of supply covers the engineering, manufacturing and testing of the three, single-shaft centrifugal BOG compression packages, along with all installation and commissioning activities. Each of the compressor packages will be driven by a 6.8-megawatt (MW) electric motor.

The project scope also includes a frame agreement to supply all low-voltage electric motors and electric variable speed drives (1-200 horsepower) and all medium-voltage (250-1,500 horsepower) electric motors.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...