Loading...
Loading...
siemens-receives-follow-up-china-lng-order
siemens-receives-follow-up-china-lng-order

Siemens receives follow-up China LNG order

0

Siemens Energy has received an order from Chengdu Cryogenic Liquidation Equipment Co to provide two compressor trains for an LNG (liquefied natural gas) project in Etuoke Qian Qi of Inner Mongolia Autonomous Region with an annual capacity of 400,000 tonnes of LNG

This marks the fifth order for Siemens from Chengdu Cryogenic. The project is planned to be put into operation in December 2015. The signing ceremony was held at the Siemens LNG Compressor Technology Forum 2014 in Huludao, Liaoning Province on September 16th.

It’s a follow-up cooperation with Chengdu Cryogenic Liquidation Equipment after the LNG project in August this year in Cangzhou, Hebei Province. The Cangzhou project has been the largest single-unit LNG production project by coke oven gas, which Siemens supplied large scale electric drive LNG compressor trains.

As a technology leader of compression market, Siemens inlet guide vanes (IGV) technology provides a more flexible and wide range turn down for projects adopted large scale electric drive. At the meantime, it compensates the power loss and the impact to the grid of the conventional converter solutions. Siemens also provides the solution of recycling primary seal gas leakage back to the compressor suction, which brings significant benefits to LNG operators to reduce its operation cost and increase production efficiency.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...