Loading...
Loading...
liquiline-to-build-terminal-for-fjord-linde
liquiline-to-build-terminal-for-fjord-linde

Liquiline to build terminal for Fjord Linde

0

Liquiline and Fjord Line are pleased to announce that the two companies have entered into a contract for the construction of a dedicated LNG ship bunkering terminal in Denmark.

The terminal will be constructed at the Port of Hirtshals, where Fjord Line on a daily basis arrives with one of its two LNG-fuelled cruise ferries MS Stavangerfjord and MS Bergensfjord. This will be the first LNG ship bunkering terminal in Denmark.

The ship bunkering terminal will be of Liquiline-design, a LiquiStation® Bulk ST2FF type. The terminal will have an on-site storage tank with a gross volume of 500m3 and a bunkering solution having a bunkering capacity of upto 400m3 of LNG per hour. This design will enable Fjord Line to bunker its ships within two hours, which is the time that the cruise ferries are docked to the port. The ship bunkering terminal is expected to be operational in Q4 2014.

The two cruise ferries are trading between Norway and Denmark. They each have a capacity of 1,500 passengers and 600 cars, trucks and cargo. They are fitted with Rolls-Royce Marine gas engines. MS Stavangerfjord was commissioned and set in operation in July 2013. MS Bergensfjord was commissioned and set in operation in March 2014.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...