A new state-of-the-art cryogenic engine manufacturing facility is set to be inaugurated by the President of India, Droupadi Murmu in Bengaluru today (27th September).
Commissioned by Indian aerospace company Hindustan Aeronautics Limited (HAL), the 4500m2 Integrated Cryogenic Engine Manufacturing Facility (ICMF) will be used to manufacture and test cryogenic (CE20) and semi-cryogenic (SE2000) engines for the Indian Space Research Organisation (ISRO).
The most widely used engines for launch vehicles designed to send rockets into space, cryogenic engines are highly complex and only a handful of countries are involved in their manufacture.
In 2014, India successfully flew the GSLV-D5 launch vehicle with a cryogenic engine built by ISRO, which led to it becoming just the sixth country to develop cryogenic engines.
... to continue reading you must be subscribed