Loading...
Loading...
frames-puts-dutch-biogas-upgrading-installation-into-production
frames-puts-dutch-biogas-upgrading-installation-into-production

Frames puts Dutch biogas upgrading installation into production

0

Total plant solution specialist Frames has now put its biogas upgrading installation in Beltrum, the Netherlands, into production.

The biogas upgrading installation will facilitate the delivery of eight million cubic metres of biogas a year to the FrieslandCampina establishment in Borculo, where it will be used to produce steam.

Frames designed and supplied the biogas upgrading installation at Groot Zevert Vergisting in the Dutch city which effectively removes hydrogen sulfide (H2S) from the biogas to below three parts per minute (ppm).

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...