Loading...
Loading...
cylinder-filling-plant-contracts-add-to-busy-months-for-igas
cylinder-filling-plant-contracts-add-to-busy-months-for-igas

Cylinder filling plant contracts add to busy months for iGas

0

UK-based iGas Technlogy Solutions has enjoyed a busy few months, with new contracts signed, the completion of a new system for a customer, and a change in location.

February saw iGAS complete an Automatic Tanker Analysis (ATA) System for a major UK customer, designed to analyse quality of product in Cryogenic Road tankers and storage vessels.

The system was designed such that tanker drivers start and stop the process and minimal interface is required with the air seperation unit (ASU) operators.

Comprised of six Driver Interface Units (DIU) located at the argon, nitrogen and oxygen liquid fill points as well in the drivers mess room, the system integrated analysers from Servomex, Siemens and Control Analytique into two control cabinets to replace obsolete equipment previously installed. Meeco moisture analysers were installed in the field close to the sample points.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...