Loading...
Loading...
baker-hughes-wins-eight-year-maintenance-contract-for-coral-sul-flng
baker-hughes-wins-eight-year-maintenance-contract-for-coral-sul-flng

Baker Hughes wins eight-year maintenance contract for Coral Sul FLNG

0

Baker Hughes has won an eight-year service contract for maintenance and monitoring of turbomachinery equipment operations at Coral Sul FLNG, the first deep-water floating liquefied natural gas (LNG) operating off the coast of Mozambique on the Eni led Coral South project.

The contract, due to start at the end of this year, will guarantee the performance of the rotating equipment at Coral Sul FLNG under pre-determined metrics, such as reliability of compressors and efficiency and low emissions of gas turbines, and also includes a provision of resident engineers, supervisors, repairs and spare parts to support maintenance activities. 

As part of the scope, Baker Hughes will also provide remote monitoring and diagnostics services, leveraging its iCenter capabilities, including Carbon Optimizer as well as a suite of other digital services based on Bently Nevada’s System 1 technology, which includes health and maintenance monitoring, data services and cyber-asset management. 

This new service agreement builds on an existing Coral Sul FLNG’s contract awarded to  Baker Hughes in 2017 for the project’s power and gas refrigeration process, including four turbo-compression trains with aeroderivative gas turbine and centrifugal compressor technology, as well as four turbo-generation units. 

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...