Loading...
Loading...
altenesol-completes-15-year-lng-supply-deal
altenesol-completes-15-year-lng-supply-deal

Altenesol completes 15-year LNG supply deal

0

IAHL Corporation subsidiary, Altenesol LNG Colombia S.A.S. has finalised a 15-year take-or-pay agreement for the first LNG Train and has increased the fully executed Canacol gas supply contract from 17.5 to 35 million standard cubic feet per day (MMscfpd).

Adventus Fuel Inc. (AFI) has executed a 15-year take or pay contract for 14,000 million btu per day (MMbtud) of LNG from train one of the Nataly 1 site. The approximate value of this contract over the full term is over (US) $800m. As an international trader, AFI’s wide array of customers will enable the LNG expansion that Altenesol has envisioned to become a major Alternative Energy Architect in South America, Central America and the Caribbean. The LNG from the second Train (180,000 GPD) has been committed to AFC and predetermined arrangements are on the way to amend the existing contract as soon as possible.

Canacol Energy (CNE) has doubled the gas supply contract from 17.5 to 35 MMscfpd for a term of 15 years based on the LNG demand from AFI. This fully executed contract secures gas supply for the second train bringing total capacity of the Nataly 1 LNG Plant to 360,000 GPD. When all contracts are finalised, the estimated total production value will be over $1.6bn over a 15-year term. The initial agreement was broadened in scope due to the significant gas find from the recently found Clarinet discovery located on the VIM5 E&P contract. The pre drill best estimate for recoverable prospective resource at Clarinet is approximately 540 billion cubic feet (BCF) of gas. This added more time to the initial process but was necessary for our expansion.

CNE has also entered into a signed agreement option, with Altenesol, to participate in the LNG revenue chain from an equity investment of 13 MMUSD into the project in exchange for an approximate 26% ownership position. Under the contract Altenesol will pay U.S 4.90 /MMbtu with a 2% escalation clause over the 15-year contract period, which is a past through to the off-takers. CNE has already executed two other gas contracts previously at 5.40 / MMbtu and 8.00 / MMbtu with 3% escalation clauses to other sources.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...